Patch Notes — v2026.09.06

#

•

•

Additions

  • Added isRoofed to GridCellData, that will automatically check for interior spaces that are surrounded by walls. [9:39]
  • Added Desk Prefab Object. [9:41]
    (The First FBX object)
  • Interior Darkness 🌚

Changes

  • TBA

Bug Fixes

  • TBA

What we plan to see within the next two weeks?

  • 💾 Campus Saving & Loading
  • 🚚 Delivery Trucks
  • 😊 More Intelligent NPCs
  • 📦 First 3D Object Imports (.FBX/.OBJ)
  • 🧩 Flooring Tool
  • 🚪 Doors
  • 🎓 Students
  • 🧑‍🏫 Professors

Leave a Reply

Page Search


September 8th, 2026 — Skyranis Studios will be operating under regular operating hours

September 9th, 2026 — Skyranis Studios will be operating under a two-hour delay today.

September 11th, 2026 — Skyranis Studios will be closed today to honor the 25th anniversary of the 9/11 Attacks.

Skyranis Studios will be closing at 3:00 PM today in accordance to our regular operating hours

CLOSED